Howard red line8/16/2023 ![]() Contractors involvedĪ joint venture (JV) between the Walsh Construction Company and Fluor was selected as the design and build contractor for RPM phase one, in December 2018. CTA will meet a portion of the project cost from its own resources. The funding for the first phase also includes a Congestion Mitigation and Air Quality Improvement (CMAQ) grant worth $125m, from the Chicago Metropolitan Agency for Planning (CMAP), and transit tax increment financing (TIF) funds, worth $622m, from the City of Chicago. CTA secured $957m from the FTA under the agreement. The project was also eligible for the 2014 Core Capacity federal funding, which was approved by the US Congress.Ī full funding grant agreement was signed with the FTA in January 2017. The US Federal Transit Administration (FTA) awarded $35m for the first phase of the project in August 2014, making it the first project to win federal funding from the FTA under the new Core Capacity Program. ![]() Financing for the Red & Purple Modernisation project Wilson Station, which was built during 19, will also be renovated as part of the modernisation. The new stations will have larger canopies, additional seats, windscreens, and security features. The stations will be equipped with better lighting and real-time information boards. Platforms will be widened from 12ft to 24ft, and the addition of modern amenities and elevators will make them accessible to disabled travellers. The four modern and accessible stations being rebuilt under the first phase will be equipped with new track and signalling systems. Similar infrastructure and station improvements will be carried out at the remaining stations along the Red and Purple lines, from north of Belmont station to Linden station in Wilmette, in the future phases. The new stations are expected to be opened by the end of 2024. The Lawrence to Bryn Mawr modernisation project will include the reconstruction of the Lawrence, Argyle, Berwyn, and Bryn Mawr stations, in addition to the replacement of tracks, support structures, bridges, and viaducts between the four stations. The works, as part of the new bypass, included the replacement of steel structures with concrete, closed-deck track, and sound barriers. The bypass, was built north of the Belmont station, to allow the Brown Line trains to run on a dedicated line, without intersecting the Red and Purple line tracks, which minimises delays at the intersection of the three lines. The first phase of the multi-phase modernisation project involves the construction of the Red-Purple bypass and the modernisation of the route between Lawrence and Bryn Mawr. The RPM project will reconstruct and expand approximately 9.6 miles (15.45km) of existing rail infrastructure along the North Red and Purple lines. Red & Purple Modernisation project details The modernisation project is expected to enhance the reliability of the services and improve the speeds along the lines, which would allow up to nine more trains an hour to run on the Red line, as well as up to eight more trains an hour on the Brown line. The CTA is also extending the 37km-long Red Line, from the 95th Street Terminal, through the greater Roseland community. Out of the 21 stations in the corridor, only six are currently ADA-accessible. ![]() Improvements to the stations and infrastructure will reduce maintenance costs and will make the stations compatible with the Americans with Disability Act (ADA). ![]() The programme will also enable the stations to handle the increasing volume of passengers. The RPM project aims to renovate the old, deteriorating infrastructure while increasing the train capacity. The current tracks and the infrastructure facilities, including the stations, are outdated and insufficient to meet the growing ridership of the rapid transit system. The Red & Purple corridor was built between 19. Need for the modernisation of Red and Purple lines The construction of phase one is expected to be completed in 2025. ![]() The cost of the first phase of the RPM project is $2.1bn, whereas the total project cost is estimated to be $4.7bn. It entered service on the Brown Line in the same month. The new bypass to remove the bottleneck on the Red, Purple, and Brown lines was completed in November 2021. The environmental assessment studies on the project were published in May 2015.Ĭonstruction of the Red-Purple Bypass under the first phase began in October 2019 while the ground-breaking for the station house and track structure reconstruction for the Lawrence to Bryn Mawr modernisation component of the project took place in June 2021. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |